McLean: Infrastructure Improvement Projects

Infrastructure Improvement Projects Map

Project Description
McLean Streetscape Phase III The project will install brick pavers, lights and landscaping along the south side of Chain Bridge Road from Redmond Drive to Old Dominion Drive to Center Street, and along both sides of Chain Bridge Road from Laughlin Street to Curran Street.  Construction is anticipated to begin in Spring 2017.
Listrani Peninsula

Added to the McLean Streetscape Phase III project in 2014, the project will design and   install landscaping, pavers, a seat wall, and a reinforced area for the future installation of public art at the peninsula  between Old Dominion Drive and Elm Street.

McLean Gateway

Completed in 2016, the project designed and constructed a landscaped medium along Old Dominion Drive at the intersection of Old Dominion Drive/McLean Drive and installed a gateway sign within the median.

Gateway Signage Completed in 2016, the project installed gateway signs at the Chain Bridge Road/Dolley Madison intersection; on Chain Bridge Road between Westmoreland Road and Tennyson Drive; and, on Old Dominion Drive between Dolley Madison Boulevard and Beverly Drive.

Chain Bridge Road
Corridor Enhancement

Completed in 2015, the project redesigned the Chain Bridge Road/Old Dominion Drive intersection and constructed pedestrian and streetscape improvements, including the extension of the peninsula at Old Dominion Drive and Elm Street to create a safe pedestrian refuge on the west side of the intersection.  The crosswalks will be restriped to align with a new pedestrian traffic signal.

Signal Replacement In 2015, new mast arms and signals were installed at the intersection of Chain Bridge Road and Old Dominion Drive.
McLean Utilities Completed in 2015, utility lines were undergrounded along the south side of Old Dominion Drive between the Lowell Avenue and the Chain Bridge Road/Old Dominion Drive intersection to Center Street; and, along both sides of Chain Bridge Road from Laughlin Street to Curran Street. 
Bicycle Way-Finding Signs
(Project not shown on map) 

Completed in 2016, this project, the first of its kind in Fairfax County, installed approximately 80 signs along bicycle routes in McLean. The signs point bicyclists to such locations as the McLean Community Center, the McLean Metrorail station and the W&OD trail.


Utility Undergrounding & Signal Replacement
Before After

OCRR - Fairfax County, Virginia

About Us | Contact Us | Web Disclaimer & Privacy Policy

Official site of the Fairfax County Office of Community Revitalization (OCR)
12055 Government Center Parkway, Suite 1048, Fairfax, VA 22035 | Phone: 703-324-9300, TTY 711
© Copyright 2017